
Send your drawings or area schedule. We reply within one business day with an itemised BOQ.
Four steps, and you see the price before you commit to anything.
We read your drawings or area schedule, flag anything that will not survive your climate, and return an itemised BOQ with lead times per line.
Material samples and shop drawings go out for sign-off. Certificates are matched to the authority that will approve your building before production starts.
Batch inspection reports and production photos at substrate, assembly, finishing and packing — issued before the container is sealed.
Export packing, supervised loading and a documentation set listed on the packing list, so clearance and site handover do not stall on paperwork.
We reply within one business day. A full itemised BOQ with lead times usually follows within two to three working days, depending on how many material lines are in scope.
Drawings or an area schedule are enough to start. Room-by-room quantities, reference photos, your target completion date and the destination port all make the price sharper. If you do not have drawings yet, send the room count and floor areas and we will work from that.
We ship from Foshan and the Greater Bay Area to Africa, the Middle East, Europe, Australia and Southeast Asia. Tell us the destination port or site and we will quote on the Incoterms that suit your clearance arrangement.